Loading Otnox...

Engineering tenders in United States.

Explore engineering procurement notices in United States.Compare published figures, review buyers and check the original requirements before preparing a bid.

Otnox tracks 3,339 engineering procurement notices from 549 buying organisations in United States over this reporting period.

April 26 – October 26, 2026

3,339

Tenders · 184 days

1.5% of the whole United States market

$63.5M

Average published value · Awarded

median $1.0M

549

Buying organisations

municipalities, utilities, state orgs

150

Open right now

127 new every week

Engineering tenders in United States

Review recent notices, their current status and submission deadlines. Open the original documents to confirm the scope and conditions.

View all

Market analysis

Engineering procurement in United States

Reporting period: April 26 to October 26, 2026. 150 notices in this report were open for bids at the snapshot date. 447 notices disclose awarded values in USD: average $63,544,499, median $1,000,000.

151 notices disclose estimated budgets in USD: average $64,818,646, median $900,000. 8 notices disclose values without a specified basis in USD: average $18,021,303, median $261,335. The most active buying organisations in this selection are NAVSUP FLT LOG CTR NORFOLK (125 notices); DSC CONTRACTING SERVICES DIVISION (84 notices); NSWC PHILADELPHIA DIV (75 notices).

Top buyers to watch · Tenders · 184 days

OrganisationTendersAnnounced value
NAVSUP FLT LOG CTR NORFOLK125—
DSC CONTRACTING SERVICES DIVISION84—
NSWC PHILADELPHIA DIV75—
NSWC DAHLGREN63$8.9M
NSWC CRANE54$2.7M
NAVAL AIR WARFARE CENTER AIR DIV51$295.1M

Average and median values help compare contract sizes. Price the specific scope, quantities and contract terms rather than treating an aggregate as a budget; an undisclosed value does not mean zero.

What Otnox does

Not another tender list. A strategy engine.

Every public tender across 80+ markets, scored, mapped and explained: so you spend effort on the bids you can actually win.

NLIT infrastructure modernization€2.4M
RORoad resurfacing programme€3.2M
LVHospital equipment supply€640K
EECloud migration services€890K
NOData center coolingkr 18M
FICybersecurity assessment€1.1M
NLIT infrastructure modernization€2.4M
RORoad resurfacing programme€3.2M
LVHospital equipment supply€640K
EECloud migration services€890K
NOData center coolingkr 18M
FICybersecurity assessment€1.1M

Real-time monitoring

New tenders appear within minutes of publication. 80+ portals checked continuously, 24/7.

LVLTEEFINONLROZAKELVLTEEFINONLROZAKELVLTEEFINONLROZAKE
RWUGINUKUSCAUACLUYRWUGINUKUSCAUACLUYRWUGINUKUSCAUACLUY

Speaks your language

Spanish tender in, English verdict out. AI output and the whole interface in multiple languages.

Good fit
5Risk flags

Buyer Intelligence

Know how each public buyer behaves before you bid: re-tender cycles, scoring habits, repeat winners and verified contacts.

usCountryCPV codeCRM boardWeekly emailSlack

Bid pipeline, not a spreadsheet

Move tenders through stages like a CRM: watching, bidding, submitted, won. Built for a sales director, not an archive.

CPV 60000000UNSPSC 781018NAICS 485PSC V112GSIN N7030CPV 45000000UNSPSC 431700DK021 72000000PSC R425NAICS 541512+ CPV · UNSPSC

Universal Category Layer

47,000+ procurement codes across CPV, NAICS, UNSPSC and more, mapped into one taxonomy, so a search in one market works in all 80+.

· the playbook

How to prepare your engineering bid

Clarify the design stage, technical disciplines and deliverables. Check the quality of existing surveys and documents and identify where additional investigation is needed.

Price the work by discipline, stage and review cycle. Include coordination, site visits and revisions, with a clear approach to changes outside the agreed design brief.

Build a compliance matrix linking each mandatory requirement to your solution, supporting evidence and responsible colleague. Resolve conflicting documents before the deadline for clarification questions.

Inputs and assumptions

List surveys, asset information and decisions required from the buyer, and explain the effect of missing inputs.

Team and disciplines

Assign qualified specialists to each discipline and show how design interfaces and subcontracted work will be coordinated.

Deliverable reviews

Define document formats, modelling requirements, review milestones and the method for closing technical comments.

Change and handover

Explain revision control, construction-stage support where requested and the final handover of editable technical files.

Frequently asked questions

Find your next engineering opportunity.

Set up your company profile and follow relevant procurement opportunities in United States.

7 day free trial. No credit card. Full access.