The Selwyn District Council intends to procure a Design and Construct (D&C) contractor for the replacement of the existing Whitecliffs Bridge over the Selwyn River. The existing bridge has reached the end of its service life and will be demolished and replaced in the same general alignment. The new bridge is expected to be a single‑lane structure with a separated pedestrian footpath, along with associated road, civil, and utility works. The scope includes detailed design, demolition of the existing bridge, construction of the replacement bridge, approach road works, barriers and safety works, utility relocations, traffic management, environmental and cultural management, and project handover.
Published
21.07.2026
Open for bids
21.07.2026
Deadline
29.09.2026
26-213 Rogan Street Signalisation
BRIGHTWATER GXP CIVIL ENABLING WORKS
Wānaka Airport: Runway Strip Widening & Grading, Grass Runway Rehabilitation & Parallel Taxiway Construction
14983 : SH1 Otaika Crossing Signalisation - Physical Works
Te Awaparahi Bay wharf construction
Contract 26/29 - Blake Street Carpark Redevelopment - Registration of Interest (ROI) – Advertising Notice
Southland Hospital MSB5 Ring Main Unit Replacement
NZQA | Office Relocation Services
Tokomaru Bay Landfill - Temporary Transfer Station Facility
Paengaroa School - Building works
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
© 2026 SIA «Vietne». All rights reserved.