The Buyer requires a multi-discipline feasibility study covering three development options: Option A1 (residential subdivision with reserve enhancement, maximising yield under the current Medium Residential Sub-zone framework); Option A2 (as A1 but tested against multi-storey attached typologies such as terraces, triplexes, and townhouses); and Option B (cleared site sale with development conditions). The study must assess each option’s technical feasibility, achievable residential yield, consenting pathway, and development costs, and produce a comparative summary suitable for inclusion in a formal Business Case.
Published
06.09.2026
Open for bids
06.09.2026
Deadline
25.09.2026
Suppliers of Independent Assess Management Reviews
Te Kura HRIS RFI
Blocks 1-5,9,12,13 Heating to Classrooms and Administration at Milson School
Sitewide Wastewater Investigation and Remediation at Milson School
ROI - Main Contractor for Kaipara College - D: Refurbishment Works
Roofing Contractor for Blocks A,B,C,D,E,F,G,H,L,O,Q,SB,T,U and 8 Roof Works and AC Inverter Relocation at Te Haikura A Kiwa
© 2026 SIA «Vietne». All rights reserved.