This Contract comprises the construction of a new single-lane roundabout at the intersection of Selwyn Road and Springston Rolleston Road, including the provision of shared path connections and associated infrastructure works. The project is intended to improve the safety, efficiency, and accessibility of this key transport corridor while supporting current and future growth within the surrounding communities. The intersection is located at the southern extent of the Rolleston urban area and forms part of an important transport link between the growing townships of Rolleston to the north and Lincoln to the south. Springston Rolleston Road currently operates as the priority route through the intersection and experiences significant commuter traffic volumes. The surrounding land uses present a range of stakeholder and interface considerations, including the Selwyn Road Sewer Pump Station within the south-western quadrant, school land to the north-west, residential properties to the north-east, and rural pastoral land to the south-east. Scope of Works The works include, but are not limited to: • Earthworks and pavement construction associated with the new roundabout and approach roads. • Construction of stormwater infrastructure. • Piping and reinstatement of existing stockwater races. • Liaison and coordination with utility providers, including protection, modification, and installation of services as required. • Construction of carriageways, kerbs and channels. • Construction of shared pathways, cycle facilities, footpaths, and vehicle crossings. • Construction of splitter islands, traffic islands, and associated traffic restraint features. • Installation of road markings and traffic signage. • Landscaping works including garden beds, planting areas, specimen trees, shrubs, grasses, groundcovers, mulching, and tree staking. • Traffic management, erosion and sediment control, noise management, survey set-out, and associated temporary works. • Maintenance of all landscaped and grassed areas for a period of 24 months following Practical Completion. • All ancillary works necessary to deliver a fully completed and operational project in accordance with the contract documentation. • Coordination of street lighting installation by Connetics, including integration of these works within the overall construction programme and management of associated construction interfaces.
Published
15.10.2026
Open for bids
15.10.2026
Deadline
12.11.2026
Solar PV and BESS – Community Resilience Programme
Open for bids·Oct 16
Road Maintenance Contract
Open for bids·Oct 14
Goulds Road Improvement – Consultancy Works
Open for bids·Sep 22
Feasibility Study - 24 Millpond Lane
Closed·Sep 6
C10112 Walkers/TwoChain Roundabout
Closed·Aug 14
Leeston library demolition & Leeston medical centre refurbishment
Closed·Aug 11
Main Roofing Contractor for gym roofing replacement at Heretaunga College
Open for bids·Oct 22
Electrical Contractor for the Blocks B, C,D1, D3, L, 4: Lighting & Switchboard Replacement at Aorere College
Open for bids·Oct 22
Main Building Contractor – E: Redevelopment at Queenstown Primary School
Open for bids·Oct 22
Main Building Contractor - 1, 5,7: Roofing and Learning Space Upgrade at Tainui School
Open for bids·Oct 22
Main Contractor for Block 8: Hessian and Wet Area Vinyl Replacement at Nga Iwi School
Open for bids·Oct 22
Beach Road Pump Station - Electrical Upgrade
Open for bids·Oct 22
Lake Terrace Water Treatment Plant Seismic Strengthening
Open for bids·Oct 25
Wastewater Network Pipe Rehabilitation 2627
Open for bids·Oct 23
Advance Notice - Coronial Support Services Procurement
Open for bids·Oct 23
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Open for bids·Oct 23
Contract 26/77 - Railway Drain Stormwater Treatment - Request for Tender – Advertising Notice
Open for bids·Oct 23
14622 - Brigham Creek Roundabout Improvements Detailed Design (RFT)
Open for bids·Oct 23
Create an account to explore this tender and find similar opportunities.