Loading Otnox...
Otnox
UKUnited Kingdom·Buyer: Sizewell C Limited

Tunnel Segment Production Monitoring System

Closed·6 Aug 2026·GBP 500,000

This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration. This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.

Published

06.08.2026

Open for bids

06.08.2026

Deadline

14.08.2026

© 2026 SIA «Vietne». All rights reserved.