This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration. This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.
Published
17.08.2026
Open for bids
17.08.2026
Deadline
21.08.2026
Tunnel Segment Production Monitoring System
Closed·Aug 12
Site Power HV/LV Electrical Design
Closed·Aug 10
Tunnel Segment Production Monitoring System
Closed·Aug 6
Fire and Rescue Services
Closed·Apr 29
Instrumentation and Monitoring
Closed·Apr 29
SZC - Waterproofing Materials
Closed·Apr 14
Tunnel Segment Production Monitoring System
Closed·Aug 12
Tunnel Segment Production Monitoring System
Closed·Aug 6
DHSC:TDD: Technology, Digital and Data (TDD) Operating Model Sprint
Awarded·Oct 14
DDaT26396 - Software Subscription
Awarded·Oct 14
Digital Blue Print Fast Track Validation
Awarded·Oct 14
CA18415 - RFQ2026/33 - NMANDD PEACEPLUS Thriving Together PEACEPLUS 3.2 Creative Cultures After school
Awarded·Oct 14
WSCC Route 10011 - Ifield & Crawley to Meath School - 4 Seats, 2 Passengers
Awarded·Oct 14
715865522 - Voyager Legal Support Contract (CCS RM6360) LOT 2 AWARD
Awarded·Oct 14
Create an account to explore this tender and find similar opportunities.