Overview of Scope Supply and installation of the HR Monitoring System to the to CRX and Nuclear Island Building The EAU (containment monitoring) system is required to continuously monitor and assess the mechanical behaviour and integrity of the Reactor Building and integrity of the Reactor Building and associated at nuclear island at Sizewell C (SZC) throughout construction, testing, and operation. The system scope covers the design, supply, installation, commissioning, and documentation of: • Monitoring sensors (including extensometers, temperature probes, hydraulic levelling pots, pendulums, invar wires, inclinometers, hygrometers, and pressure sensors) • Associated cabling, connection/grouping boxes, and acquisition/data logger cabinets • All necessary software interfaces and data collection/reporting tools More than 200 sensors will be embedded and installed in both the inner containment wall and the common raft of the nuclear island. The EAU monitoring system must provide real-time and periodic data on: • Settlements and deformations of the nuclear island raft (topographical markers, hydraulic levelling pots, extensometers, and temperature sensors) • Overall containment distortions (pendulums and invar wires) • Localized deformations and tendon failure detection (embedded extensometers, local monitoring devices) • Tension in prestressed cables (dynamometers) • Environmental parameters (temperature, humidity, internal and external pressure) All EAU system components must comply with the Book of Technical Specifications (BTS) Chapter 9.04 and associated referenced as well as client installation and interface requirements. Instruments must be delivered with calibration certificates and installed in accordance with manufacturer and project-specific procedures. The EAU system contractor will also provide: • Installation studies and execution drawings for all phases (temporary/erection and permanent/operational) • Material Approval Forms, Inspection and Test Plans, Quality Release Certificates, and Lifetime Quality Records (LTQR) • Data collection, reporting formats, and periodic analysis files as required by the client (monthly/bi-monthly during construction; weekly/daily during key phases; and as specified during operation) Additional information: It will be beneficial for you to describe your business as much as possible and highlight where you can help us to achieve our values described above
Published
27.03.2026
Aktīvs
27.03.2026
Deadline
10.04.2026
Tunnel Segment Production Monitoring System copy
Closed·Aug 17
Tunnel Segment Production Monitoring System
Closed·Aug 12
Site Power HV/LV Electrical Design
Closed·Aug 10
Tunnel Segment Production Monitoring System
Closed·Aug 6
Fire and Rescue Services
Closed·Apr 29
Instrumentation and Monitoring
Closed·Apr 29
Technical Approval Authority - Advisor
Awarded·Sep 29
PS26279 - 2N245 Server Room Cambridge
Awarded·Sep 24
NW - CDF - Lot 1 - Glasson Dock Gate Detailed Design
Awarded·Sep 22
CA18274 - ITT 44/2026 44 - ICT For Newry City to Poyntzpass Greenway Improvements BCC Framework Lot 1
Awarded·Sep 18
BRE037 - 100ft Desilting 2026-2027
Awarded·Sep 15
BRE031 - Cradge Bank Repairs 2026-2027
Awarded·Sep 15
DDaT26396 - Software Subscription
Awarded·Oct 14
Digital Blue Print Fast Track Validation
Awarded·Oct 14
CA18415 - RFQ2026/33 - NMANDD PEACEPLUS Thriving Together PEACEPLUS 3.2 Creative Cultures After school
Awarded·Oct 14
WSCC Route 10011 - Ifield & Crawley to Meath School - 4 Seats, 2 Passengers
Awarded·Oct 14
715865522 - Voyager Legal Support Contract (CCS RM6360) LOT 2 AWARD
Awarded·Oct 14
Forensic Case Management System
Awarded·Oct 14
Create an account to explore this tender and find similar opportunities.