The project consists of design, construction, supply, installation and reinstatement works and siteworks which includes but are not limited to: • Development of the design documentation and building consent application. • Submission and management of building consent. • Demolition of the existing toilet, including debris removal and disposal to an approved dump site, and reinstatement of affected surrounding areas. • Supply, install and delivery of a new two pan turnkey concrete toilet block. • Installation of new power, water through new water tank, sewer and stormwater service connections. • Level the ground beside the toilet and extend the stormwater manhole riser to match. Add a drainage opening in the riser for playground runoff and fit a dome grate over the manhole inlet.
Published
03.09.2026
Open for bids
03.09.2026
Deadline
09.10.2026
Suppliers of Independent Assess Management Reviews
Te Kura HRIS RFI
Blocks 1-5,9,12,13 Heating to Classrooms and Administration at Milson School
Sitewide Wastewater Investigation and Remediation at Milson School
ROI - Main Contractor for Kaipara College - D: Refurbishment Works
Roofing Contractor for Blocks A,B,C,D,E,F,G,H,L,O,Q,SB,T,U and 8 Roof Works and AC Inverter Relocation at Te Haikura A Kiwa
© 2026 SIA «Vietne». All rights reserved.