This project is the refurbishment of the Ulva Island wharf structure located at Post Office Cove, Ulva Island. The key objective is to replace the existing structure with a fit for purpose wharf facility to enable safe public access/egress to and from Ulva Island over a full range of weather and tidal conditions, the works comprises: a) site establishment, preliminaries and logistics. b) demolition and removal of existing wharf structures. c) foundation piling for new wharf structure. d) abutment installations and existing ramp adjustments. e) installation of new wharf structures and stairs. f) installation of miscellaneous items such as ladders, chains fixings and signage. g) site demobilisation and clean-up.
Published
03.09.2026
Open for bids
03.09.2026
Deadline
23.10.2026
ROI - Otara Wastewater Network Upgrade Design Services
Suppliers of Independent Asset Management Reviews
RFT - Main Contractor for Design, Supply, & Installation of a Covered Outdoor Learning Canopy at Waimea Intermediate School, Nelson
High Tech Imaging Services
Elective Surgery Services
Registration of Interest - Main Contractor - Block 6 Cladding Replacement - Thorrington School
© 2026 SIA «Vietne». All rights reserved.