A large rain event occurred in Southland in September 2023. This led to surface flooding across the region. Southland District Council (SDC) received complaints of surface flooding from several residents in Winton township. A stormwater upgrade was completed on Arthur Street in 2024. WSP have previously undertaken a stormwater model build for the township of Winton with several recommended upgrades and locations to investigate further. Based on this, water flooding concerns on Waterford Drive to be addressed by construction of new stormwater main draining to open channel on the west. SDC propose to upgrade the stormwater network by construction of an additional stormwater main on Waterford Drive to reduce the flooding experienced in this area in future events. The upgrade would be from the outlet drain on Ivy Russell Reserve on the western side of 48 Hillary Street to Niddry Crescent Waterford Drive Intersection.
Published
16.08.2026
Open for bids
16.08.2026
Deadline
25.09.2026
Suppliers of Independent Assess Management Reviews
Te Kura HRIS RFI
Blocks 1-5,9,12,13 Heating to Classrooms and Administration at Milson School
Sitewide Wastewater Investigation and Remediation at Milson School
ROI - Main Contractor for Kaipara College - D: Refurbishment Works
Roofing Contractor for Blocks A,B,C,D,E,F,G,H,L,O,Q,SB,T,U and 8 Roof Works and AC Inverter Relocation at Te Haikura A Kiwa
© 2026 SIA «Vietne». All rights reserved.