Deadline
22.09.2025
Published
09.01.2026
Open for bids
09.01.2026
Awarded
21.01.2026
Conditions updated
21.01.2026
Feasibilty Study and Detailed study for the water supply network from Sake to the New Kigali International Airport (Bugesera)
Active
Feasibility and Detailed Design studies for network extensions in Kigali and peri-urban areas
Active
000002/G/NCB/2024/2025/WASAC Development
Active
000007/G/NCB/2024/2025/WASAC Development
Active
Acquisition of Office Equipment, Workstations and Other Furnitures under framework contract
Active
000003/NC/SS/2025/2026/WASAC Development
Active
© 2026 SIA «Vietne». All rights reserved.