Deadline
04.12.2024
Published
26.03.2026
Awarded
26.03.2026
Feasibilty Study and Detailed study for the water supply network from Sake to the New Kigali International Airport (Bugesera)
Active
Feasibility and Detailed Design studies for network extensions in Kigali and peri-urban areas
Active
000002/G/NCB/2024/2025/WASAC Development
Active
000007/G/NCB/2024/2025/WASAC Development
Active
000003/NC/SS/2025/2026/WASAC Development
Active
000001/W/ICB/2025/2026/WASAC Development
Active
© 2026 SIA «Vietne». All rights reserved.