Published
04.08.2026
Open for bids
04.08.2026
Deadline
26.08.2026
Feasibilty Study and Detailed study for the water supply network from Sake to the New Kigali International Airport (Bugesera)
Active
000002/G/NCB/2024/2025/WASAC Development
Active
000007/G/NCB/2024/2025/WASAC Development
Active
Acquisition of Office Equipment, Workstations and Other Furnitures under framework contract
Active
000003/NC/SS/2025/2026/WASAC Development
Active
000001/W/ICB/2025/2026/WASAC Development
Active
© 2026 SIA «Vietne». All rights reserved.