NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works include the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely and correctly complete the installation and handover of Precast Concrete UTX (Under Track Crossing) chamber system and adjoining ducts , as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. The UTX system comprises segmented precast concrete chambers with precast concrete covers, seated on a precast concrete base. The precast chambers and covers shall be supplied and delivered to site by the Contractor for installation by the Subcontractor. Contractor will Undertake excavation works to the UTX duct formation level, subcontractor will complete excavation for installation of UTX Chambers and ducts. The Subcontract works include, but are not limited to: Dewatering of excavations as required. Provision of edge protection to ensure that excavation is safe for works Protection of all existing assets Setting out the UTX in accordance with the design and specifications, using primary control points provided by the Contractor. Transfer UTX Chambers from Laydown Area to point of installation Installation of the UTX system comprising segmented precast concrete chambers using methodology provided in detailed design Install all units onto the precast concrete base slabs provided by the Contractor. Install the full precast assembly, including the Precast concrete chamber segments and Precast concrete covers Install all components in accordance with the approved drawings, specified line and level, and manufacturer's instructions. Supply and install all associated ducting, ensuring compliance with project specifications and drawings. As part of installation, CBGM / Cast in situ concrete - minimum FND4 concrete around UTX and ducts to be done by Subcontractor Testing and handover
Published
23.06.2026
Open for bids
23.06.2026
Conditions updated
23.06.2026
Deadline
30.06.2026
EKFB JV - NC2A WGT Portal Buildings Blockwork package
Closed·Sep 16
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
Closed·Sep 15
EKFB JV - As - Built Surveys
Closed·Aug 27
EKFB JV - Waste Management Services
Closed·Aug 26
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
Closed·Jul 31
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
Closed·Jun 11
M6 Lune Gorge - Roundthwaite Structure Precast Concrete Units
Closed·Sep 9
Euston Scissor Box Precast Roof Panels
Closed·Jun 11
BBV HS2 DELTA - Precast Concrete Culvert (Supply only)
Closed·Dec 2
BBV HS2 MWCC North - Reinforced Concrete Trough Covers
Closed·Oct 21
DDaT26396 - Software Subscription
Awarded·Oct 14
Digital Blue Print Fast Track Validation
Awarded·Oct 14
CA18415 - RFQ2026/33 - NMANDD PEACEPLUS Thriving Together PEACEPLUS 3.2 Creative Cultures After school
Awarded·Oct 14
WSCC Route 10011 - Ifield & Crawley to Meath School - 4 Seats, 2 Passengers
Awarded·Oct 14
715865522 - Voyager Legal Support Contract (CCS RM6360) LOT 2 AWARD
Awarded·Oct 14
Forensic Case Management System
Awarded·Oct 14
Create an account to explore this tender and find similar opportunities.