EKFB are looking for a Subcontractor for the design, supply, installation, management and completion of the Claydon Road Overbridge Access Stairs and Hard Slope (hard landscaping) trial works, including all labour, plant, equipment, materials, temporary works, supervision and quality documentation required to deliver the works. Works to include the following elements Review of the proposed product requirements and recommendation of suitable alternatives where applicable. Preparation and submission of shop drawings for acceptance. Supply and installation of: GRP stair panels Posts Hollow blocks Fixings and consumables Paving slabs Edging kerbs Associated stair and hard slope components Installation of aggregate and topsoil in accordance with permanent works specifications. Identification of any exclusions necessary to complete the works. Trial Works will then inform the methodology on how we proceed going forward with further structures within the G2S section of the works, if successful leading to future works. G2S have approximately 29 sets of Access Stairs of various lengths to be supplied and / or installed.
Published
15.09.2026
Open for bids
15.09.2026
Deadline
25.09.2026
EKFB JV - As - Built Surveys
EKFB JV - Waste Management Services
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
EKFB JV - Ancillary Culverts Works package NC2A
© 2026 SIA «Vietne». All rights reserved.