The supplier will be responsible for the manufacture, fabrication and supply of the precast roof panels for Euston Scissor Box, the supplier will also be required to carry out the stage 5 design including fabrication and shop drawings. The supplier will also be responsible for the temporary works scheme.
Published
11.06.2026
Open for bids
11.06.2026
Deadline
25.06.2026
M6 Lune Gorge - Roundthwaite Structure Precast Concrete Units
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». All rights reserved.