NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works include the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete the construction and handover of Ancillary Culverts, as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. - The subcontractor will be responsible for all permanent and temporary work relating to the construction of ancillary culverts and associated works unless otherwise stated in the Works Information including: - Temporary access road and platform construction - Temporary watercourse diversion including over pumping and tie into watercourse. - Temporary excavation for culvert units and headwalls. - Permanent Excavate and replace and removal of soft spot. - Blinding concrete for culvert units, headwalls and retaining walls - Installation of culvert units, including waterproofing at joints and joints details. - FRC works with Headwalls and retaining walls, including waterproofing and joints details. - Temporary edge protection - Supply and Installation of handrails - Completing structural fill surrounding culvert units, headwalls and retaining walls - Installation of riverbed materials and riprap materials - Completing the tie in of watercourse to culvert including reinstatement of temporary diversion. - Testing Please express your interest within this package.
Zveřejněno
18.05.2026
Aktīvs
18.05.2026
Termín
22.05.2026
EKFB JV - NC2A WGT Portal Buildings Blockwork package
Uzavřeno·Sep 16
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
Uzavřeno·Sep 15
EKFB JV - As - Built Surveys
Uzavřeno·Aug 27
EKFB JV - Waste Management Services
Uzavřeno·Aug 26
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
Uzavřeno·Jul 31
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
Uzavřeno·Jun 23
CWF Lot 2A - Reconstruction of Bellow Hill Culvert
Přiděleno·Sep 16
CWF Lot 2a - Reconstruction of Newbiggin Manor Farm Culvert
Přiděleno·Sep 16
EKFB JV - Ancillary Culverts Works package NC2A
Uzavřeno·May 18
A66 - Scheme 3A - Penrith to Temple Sowerby - Culvert Installation
Uzavřeno·May 12
A66 - Scheme 3A - Penrith to Temple Sowerby - Culvert Installation
Uzavřeno·May 12
NW AOMR Lot 1 Grimsargh Culvert Refurbishment and Culvert CCTV & Cleanse
Přiděleno·Dec 3
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.