NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontractor shall provide all necessary management, supervision, plant, labour, materials and temporary works to deliver the blockwork package for Wendover Green Tunnel Portal Buildings. The works comprise the construction of external masonry walls and internal masonry partition walls, including the supply and installation of the following, but not limited to: •Concrete blockwork on the external perimeter walls to be on a 150mm x 140mm concrete upstand • Internal partition walls are to be founded directly on the structural foundation slab. • Sand and cement skirting •440x215x140mm 7.3N/mm2 1450kg/m3 concrete blockwork, including all associated connections and movement joints •Stainless steel bed joint reinforcement and all masonry ties •Padstones •Concrete lintels •Wall head fire stopping system Please carefully consider the information above and whether this opportunity is suitable for your business before registering your interest.
Zveřejněno
16.09.2026
Otevřeno k podání nabídek
16.09.2026
Termín
23.09.2026
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
Uzavřeno·Sep 15
EKFB JV - As - Built Surveys
Uzavřeno·Aug 27
EKFB JV - Waste Management Services
Uzavřeno·Aug 26
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
Uzavřeno·Jul 31
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
Uzavřeno·Jun 23
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
Uzavřeno·Jun 11
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.