EKFB JV seek EOI's from interested parties with the appropriate experience and resources for the supply of Welfare Equipment (inclusive of Mobile Welfare Accommodation, Welfare Vans, Portable Toilets) to support the delivery of our C23 HS2 project. The 3 areas for delivery are North Chilterns Area and Aylesbury Area (NC2A), Calvert to Greatworth (C2G) and Greatworth to Southam (G2S). EKFB JV is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation. EKFB JV may look to award multiple agreements to suit geographical capability dependent on the response to this EOI, in support of SME's and Local Businesses.
Zveřejněno
31.07.2026
Otevřeno k podání nabídek
31.07.2026
Termín
12.08.2026
EKFB JV - NC2A WGT Portal Buildings Blockwork package
Uzavřeno·Sep 16
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
Uzavřeno·Sep 15
EKFB JV - As - Built Surveys
Uzavřeno·Aug 27
EKFB JV - Waste Management Services
Uzavřeno·Aug 26
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
Uzavřeno·Jun 23
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
Uzavřeno·Jun 11
Buckley Barracks SLA - RIBA Stage 3-4
Přiděleno·Sep 30
Claremont Redevelopment - Kingsweston Temporary Classrooms - Installation & Lease
Přiděleno·Sep 25
Milford Infants Modular Hall
Přiděleno·Sep 24
Provision of Close Quarter Combat systems - RFI/PME
Uzavřeno·Sep 22
Equipment Support Tactical Workshop
Uzavřeno·Sep 18
Tinsley Golf Course Temporary Facility
Přiděleno·Aug 17
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.