NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works include the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely and correctly complete the installation and handover of Precast Concrete UTX (Under Track Crossing) chamber system and adjoining ducts , as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. The UTX system comprises segmented precast concrete chambers with precast concrete covers, seated on a precast concrete base. The precast chambers and covers shall be supplied and delivered to site by the Contractor for installation by the Subcontractor. Contractor will Undertake excavation works to the UTX duct formation level, subcontractor will complete excavation for installation of UTX Chambers and ducts. The Subcontract works include, but are not limited to: Dewatering of excavations as required. Provision of edge protection to ensure that excavation is safe for works Protection of all existing assets Setting out the UTX in accordance with the design and specifications, using primary control points provided by the Contractor. Transfer UTX Chambers from Laydown Area to point of installation Installation of the UTX system comprising segmented precast concrete chambers using methodology provided in detailed design Install all units onto the precast concrete base slabs provided by the Contractor. Install the full precast assembly, including the Precast concrete chamber segments and Precast concrete covers Install all components in accordance with the approved drawings, specified line and level, and manufacturer's instructions. Supply and install all associated ducting, ensuring compliance with project specifications and drawings. As part of installation, CBGM / Cast in situ concrete - minimum FND4 concrete around UTX and ducts to be done by Subcontractor Testing and handover
Zveřejněno
23.06.2026
Otevřeno k podání nabídek
23.06.2026
Podmínky aktualizovány
23.06.2026
Termín
30.06.2026
EKFB JV - NC2A WGT Portal Buildings Blockwork package
Uzavřeno·Sep 16
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
Uzavřeno·Sep 15
EKFB JV - As - Built Surveys
Uzavřeno·Aug 27
EKFB JV - Waste Management Services
Uzavřeno·Aug 26
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
Uzavřeno·Jul 31
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
Uzavřeno·Jun 11
M6 Lune Gorge - Roundthwaite Structure Precast Concrete Units
Uzavřeno·Sep 9
Euston Scissor Box Precast Roof Panels
Uzavřeno·Jun 11
BBV HS2 DELTA - Precast Concrete Culvert (Supply only)
Uzavřeno·Dec 2
BBV HS2 MWCC North - Reinforced Concrete Trough Covers
Uzavřeno·Oct 21
TD2448 - Leisure procurement - Legal Support
Přiděleno·Nov 2
SAL19079 - Transpennine Railway Upgrade (TRU) W4
Přiděleno·Nov 2
GB-Cromer: PROC152 Car Park Re Surfacing Works
Otevřeno k podání nabídek·Nov 2
National Witness Service and Homicide Service Evaluation Prerequisites
Přiděleno·Nov 2
Award of a call off contract under the Prison Education Dynamic Purchasing System for CSCS Card provision for prisoners at HMP Winchester
Přiděleno·Nov 2
Project management support for Wholesale Distribution Authorisation application - SECAmb
Přiděleno·Nov 2
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.