Loading Otnox...
Otnox
NONorge·Innkjøper: Gassco

The NORA project - Network Operations and Real-time Analysis

Lukket·13 apr. 2026·NOK 100,000,000

Replace the existing Pipeline Modelling System and SCADA front-end with a new PMS solution combined with a Control Room User Interface to be used in the Transport Control Centre (TCC).

Publisert

13.04.2026

Published

13.04.2026

Published

04.05.2026

© 2026 SIA «Vietne». Alle rettigheter forbeholdt.