Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. Permanent Way Scope of Work: The supply, installation, testing and commissioning of the new turnback facility to accommodate trains: 1. provision for a 6-car and buffer stop siding facility 2. passive provision for an 8-car and buffer stop turnback facility 3. track drainage This includes all hand back deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.
Publisert
07.10.2025
Åpen for tilbud
07.10.2025
Frist
13.10.2025
Oldfield Road - E & P Works
Lukket·Oct 22
Oldfield Road - Telecoms
Lukket·Oct 22
Brewery Turnback - ES6-8 Devegetation Works
Lukket·Oct 7
Brewery Turnback - ES6-8 E & P Works
Lukket·Oct 7
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Lukket·Oct 7
Brewery Turnback - ES6-8 OLE Infrastructure
Lukket·Oct 7
Manchester International Airport - OLE Phase 3 Works
Lukket·Sep 30
Manchester International Airport - Demolition Works
Lukket·Aug 27
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Lukket·Oct 7
Housing & Property Management Level 4 apprenticeships
Tildelt·Nov 3
Fire Remediation works - Baker House (D&B)
Tildelt·Nov 3
Humber Economic Strategy Delivery Plan
Tildelt·Nov 3
ENHT - Legal Support HCH PFI 2026
Tildelt·Nov 3
Super Pumping Appliances
Tildelt·Nov 3
APEX and PowerApp Support
Tildelt·Nov 3
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.