This is an enhancement scheme funded by the DfT and is part of a package of proposed measures in the Manchester area that are planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. The scheme is for the design and delivery of an East facing turnback, located on the Manchester, Bolton and Bury Line (ELR: MVE1) adjacent to the existing Salford Hope Street (Cemex) sidings between Salford Central Station and the Oldfield Road Bridge. At Victoria Station, the through platforms also accommodate terminating trains. The extended time to terminate and turnback in the platforms restricts platform availability for through services. The provision of the turnback siding will allow terminating services from the East arriving at Victoria to clear the platform, travel to the turnback siding and await their next turn of duty, clear of the station. There is the further benefit of an additional stop at Salford Central Station for passengers to disembark for Manchester Spinningfields, a major employment location in the city centre. The turnback would also act as a service recovery measure during times of service perturbation. The turnback is to consist of two roads, to accommodate trains up to 8 car x 24m in one road and 6 car x 24m in a second road; with access to and from platforms 3-6 at Manchester Victoria via existing connections. The new east facing turnback shall also be able to operate as a berthing/storage siding, with walking routes to allow train crew to access and egress the railway. The turnback will be fully electrified at 25kV and be fully signalled as a route for planned, rather than simply emergency, usage. The supply, installation, testing and commissioning of the point heating system. This includes, but is not limited to: Mains Distribution equipment, 230v and 110v LV cabling, Heater strips, Heat retainers, Clamp lock heaters, TCBs', PHT's and associated controls.
Publisert
22.10.2025
Åpen for tilbud
22.10.2025
Frist
28.10.2025
Oldfield Road - Telecoms
Lukket·Oct 22
Brewery Turnback - ES6-8 Devegetation Works
Lukket·Oct 7
Brewery Turnback - ES6-8 E & P Works
Lukket·Oct 7
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Lukket·Oct 7
Brewery Turnback - ES6-8 OLE Infrastructure
Lukket·Oct 7
Brewery Turnback - ES6-8 Permanent Way
Lukket·Oct 7
Housing & Property Management Level 4 apprenticeships
Tildelt·Nov 3
Fire Remediation works - Baker House (D&B)
Tildelt·Nov 3
Humber Economic Strategy Delivery Plan
Tildelt·Nov 3
ENHT - Legal Support HCH PFI 2026
Tildelt·Nov 3
Super Pumping Appliances
Tildelt·Nov 3
APEX and PowerApp Support
Tildelt·Nov 3
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.