The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - OLE Specialist Works for Manchester Airport Station Remodelling
Publisert
30.09.2026
Åpen for tilbud
30.09.2026
Frist
09.10.2026
Manchester International Airport Phase 2 - Overbridge Civils
Lukket·Oct 23
Manchester International Airport - Rail Footprint Civils
Lukket·Oct 15
Manchester International Airport - Shotcrete works
Lukket·Oct 6
Manchester International Airport - Demolition Works
Lukket·Aug 27
Manchester International Airport - Permanent Way Works
Lukket·Aug 19
Manchester International Airport - Precast Concrete Beams
Lukket·Jul 13
Manchester International Airport - Demolition Works
Lukket·Aug 27
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Lukket·Oct 7
Brewery Turnback - ES6-8 Permanent Way
Lukket·Oct 7
Housing & Property Management Level 4 apprenticeships
Tildelt·Nov 3
Fire Remediation works - Baker House (D&B)
Tildelt·Nov 3
Humber Economic Strategy Delivery Plan
Tildelt·Nov 3
ENHT - Legal Support HCH PFI 2026
Tildelt·Nov 3
Super Pumping Appliances
Tildelt·Nov 3
APEX and PowerApp Support
Tildelt·Nov 3
Opprett en konto for å undersøke anskaffelsen og finne lignende muligheter.