The works relate to 13 door sets and shall be undertaken in two separate visits per door set as follows: Visit 1 - Decommissioning Isolate and decommission the existing magnetic lock installed on each designated door set. Ensure the existing access control system remains safe and secure following decommissioning activities. Coordinate works to facilitate the fire door upgrade programme. Visit 2 - Commissioning Attend site following completion of the fire door upgrades and installation of replacement magnetic locks by others. Commission the newly installed magnetic locks into the existing access control system. Configure and verify operation of each magnetic lock in accordance with the existing system requirements. Testing and Commissioning Upon completion of the commissioning works, the Contractor shall: Test each magnetic lock to confirm correct operation. Verify door release functionality. Confirm fail-safe operation where applicable. Ensure integration with the existing access control system is functioning correctly. Report any defects, faults, or issues identified with the existing equipment or system infrastructure to the Client.
Sluitingsdatum
30.07.2026
Gepubliceerd
18.08.2026
Gegund
18.08.2026
Clerk of Works (Fire Alarm Replacement Scheme)
Gegund·Oct 12
Dirty Utility Works GRH Tower Block
Gegund·Sep 8
Provision of Emergency Asbestos-related works
Gegund·Sep 2
King Builders Various Minor Works Projects
Gegund·Aug 19
Project Management Support _ Provelio
Gegund·Aug 17
CGH BMS Upgrade Project 2026/2027
Gegund·Aug 6
Housing & Property Management Level 4 apprenticeships
Gegund·Nov 3
Fire Remediation works - Baker House (D&B)
Gegund·Nov 3
Humber Economic Strategy Delivery Plan
Gegund·Nov 3
ENHT - Legal Support HCH PFI 2026
Gegund·Nov 3
Super Pumping Appliances
Gegund·Nov 3
APEX and PowerApp Support
Gegund·Nov 3
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.