The Tower Block Dirty Utility Conversion works at Gloucestershire Royal Hospital comprise the conversion of existing dirty utility rooms into bin stores as part of remedial measures to improve fire safety. The scope of works includes isolating and draining down the hot and cold-water services; removing redundant pipework, fittings and waste connections serving the sluice sink; stripping out the existing worktop and wall-mounted fixtures; isolating and removing socket fronts to facilitate the installation of floor-to-ceiling white rock wall cladding with jointing strips; reinstating socket fronts upon completion; providing Chapter 8 barriers to the lift lobby and ward access areas; checking that riser cupboard door locks and slip bolts are operational; and providing a banksman as required.
Sluitingsdatum
14.08.2026
Gepubliceerd
08.09.2026
Gegund
08.09.2026
BE049 Parkhouse Street Design and Build Contract
SIXEP/FHP Main Roof Refurbishment Project
CBC-1970-T-SM A&A Works-Single Story Extension - AWARD
Kitchen & Bathroom Replacements
Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
Timber Crib Wall Repair
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rechten voorbehouden.