The works are required to ensure a safe fire escape route for staff and the public and involve the installation of a protective ceiling system beneath an existing suspended ceiling. The solution includes the installation of a structural timber framework and plywood barrier designed to contain falling debris and maintain safe access and headroom. All works will be carried out in accordance with the Control of Asbestos Regulations 2012 and relevant health and safety legislation. The works include site preparation, installation, sealing to prevent dust migration, and full clean-up. This requirement has been identified as urgent due to health and safety risks associated with the existing conditions, and immediate action is required to ensure compliance and safe operation of the facility.
Sluitingsdatum
14.08.2026
Gepubliceerd
02.09.2026
Gegund
02.09.2026
Clerk of Works (Fire Alarm Replacement Scheme)
Gegund·Oct 12
Dirty Utility Works GRH Tower Block
Gegund·Sep 8
King Builders Various Minor Works Projects
Gegund·Aug 19
Women's Centre Fire Door Mag Lock Works
Gegund·Aug 18
Project Management Support _ Provelio
Gegund·Aug 17
CGH BMS Upgrade Project 2026/2027
Gegund·Aug 6
Housing & Property Management Level 4 apprenticeships
Gegund·Nov 3
Fire Remediation works - Baker House (D&B)
Gegund·Nov 3
Humber Economic Strategy Delivery Plan
Gegund·Nov 3
ENHT - Legal Support HCH PFI 2026
Gegund·Nov 3
Super Pumping Appliances
Gegund·Nov 3
APEX and PowerApp Support
Gegund·Nov 3
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.