The waterproofing package includes the supply of all materials, namely bonded and unbonded membranes, waterbar materials and accessories, which are assembled and installed to form a specific waterproofing system to meet the design requirements. Dependent on the waterproofing system used, the waterproofing materials can be cast into the concrete when poured or applied post pour. The system design is installed to prevent the ingress of water into. The requirement includes 120,000 m2 bonded membrane, 45,000 m2 unbonded membrane, 30,000 l/m joint waterbars, 4,500 l/m hydrophilic waterbars, 15,800 l/m elastomer waterbars, 36,540 l/m PVC waterbars as well as related accessories such as 22,000 units of sealants and adhesives and compressible materials to suit seismic design.
Gepubliceerd
14.04.2026
Aktīvs
14.04.2026
Sluitingsdatum
23.04.2026
CA17911 - Roofing Works Leicester College
PAHT - Waterproofing Works in Plantrooms
M6 Lune Gorge - Waterproofing and Expansion Joints
Procurement of office and IT equipment
T0345 - Dry Dock & Repair of Lightvessel 06
T0345 - Dry Dock & Repair of Lightfloat 03
T0345 - Dry Dock & Repair of Lightvessel 07
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
© 2026 SIA «Vietne». Alle rechten voorbehouden.