This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration. This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.
Gepubliceerd
12.08.2026
Open voor inschrijvingen
12.08.2026
Sluitingsdatum
14.08.2026
Procurement of office and IT equipment
T0345 - Dry Dock & Repair of Lightvessel 06
T0345 - Dry Dock & Repair of Lightfloat 03
T0345 - Dry Dock & Repair of Lightvessel 07
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
© 2026 SIA «Vietne». Alle rechten voorbehouden.