This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration. This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.
Gepubliceerd
17.08.2026
Open voor inschrijvingen
17.08.2026
Sluitingsdatum
21.08.2026
Tunnel Segment Production Monitoring System
Gesloten·Aug 12
Site Power HV/LV Electrical Design
Gesloten·Aug 10
Tunnel Segment Production Monitoring System
Gesloten·Aug 6
Fire and Rescue Services
Gesloten·Apr 29
Instrumentation and Monitoring
Gesloten·Apr 29
Instrumentation and Monitoring
Gesloten·Apr 29
Tunnel Segment Production Monitoring System
Gesloten·Aug 12
Tunnel Segment Production Monitoring System
Gesloten·Aug 6
Housing & Property Management Level 4 apprenticeships
Gegund·Nov 3
Fire Remediation works - Baker House (D&B)
Gegund·Nov 3
Humber Economic Strategy Delivery Plan
Gegund·Nov 3
ENHT - Legal Support HCH PFI 2026
Gegund·Nov 3
Super Pumping Appliances
Gegund·Nov 3
APEX and PowerApp Support
Gegund·Nov 3
Maak een account aan om deze aanbesteding te onderzoeken en vergelijkbare kansen te vinden.