NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works include the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete the construction and handover of Ancillary Culverts, as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. - The subcontractor will be responsible for all permanent and temporary work relating to the construction of ancillary culverts and associated works unless otherwise stated in the Works Information including: - Temporary access road and platform construction - Temporary watercourse diversion including over pumping and tie into watercourse. - Temporary excavation for culvert units and headwalls. - Permanent Excavate and replace and removal of soft spot. - Blinding concrete for culvert units, headwalls and retaining walls - Installation of culvert units, including waterproofing at joints and joints details. - FRC works with Headwalls and retaining walls, including waterproofing and joints details. - Temporary edge protection - Supply and Installation of handrails - Completing structural fill surrounding culvert units, headwalls and retaining walls - Installation of riverbed materials and riprap materials - Completing the tie in of watercourse to culvert including reinstatement of temporary diversion. - Testing Please express your interest within this package.
Gepubliceerd
18.05.2026
Aktīvs
18.05.2026
Sluitingsdatum
22.05.2026
EKFB JV - NC2A WGT Portal Buildings Blockwork package
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
EKFB JV - As - Built Surveys
EKFB JV - Waste Management Services
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
CWF Lot 2A - Reconstruction of Bellow Hill Culvert
CWF Lot 2a - Reconstruction of Newbiggin Manor Farm Culvert
A66 - Scheme 3A - Penrith to Temple Sowerby - Culvert Installation
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rechten voorbehouden.