Specialist culvert works required on the A66 Scheme 3a
Gepubliceerd
12.05.2026
Aktīvs
12.05.2026
Sluitingsdatum
15.05.2026
A66 - Scheme 3A - Penrith to Temple Sowerby - Facilities Management
A66 - Scheme 3A - Penrith to Temple Sowerby - Haul Road Construction
A66 - Scheme 3A - Penrith to Temple Sowerby - Compound Construction
A66 - Scheme 3A - Penrith to Temple Sowerby - Primary Survey Control
A66 - Scheme 3A - Penrith to Temple Sowerby - Dewatering
A66 - Scheme 3A - Penrith to Temple Sowerby - Drainage
CWF Lot 2A - Reconstruction of Bellow Hill Culvert
CWF Lot 2a - Reconstruction of Newbiggin Manor Farm Culvert
EKFB JV - Ancillary Culverts Works package NC2A
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». Alle rechten voorbehouden.