NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontractor shall provide all necessary management, supervision, plant, labour, materials and temporary works to deliver the blockwork package for Wendover Green Tunnel Portal Buildings. The works comprise the construction of external masonry walls and internal masonry partition walls, including the supply and installation of the following, but not limited to: •Concrete blockwork on the external perimeter walls to be on a 150mm x 140mm concrete upstand • Internal partition walls are to be founded directly on the structural foundation slab. • Sand and cement skirting •440x215x140mm 7.3N/mm2 1450kg/m3 concrete blockwork, including all associated connections and movement joints •Stainless steel bed joint reinforcement and all masonry ties •Padstones •Concrete lintels •Wall head fire stopping system Please carefully consider the information above and whether this opportunity is suitable for your business before registering your interest.
Gepubliceerd
16.09.2026
Open voor inschrijvingen
16.09.2026
Sluitingsdatum
23.09.2026
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
EKFB JV - As - Built Surveys
EKFB JV - Waste Management Services
EKFB - Welfare Equipment (Additional Mobile Welfare Accommodation Resource) - Opportunity
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
EKFB JV - NC2A Footway and Accommodation Overbridges FRC works
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
Monitoring Support and Data Management Services for Continuous Air Quality Monitoring Sites
NHP - Hospital 2.0 Alliance (H2A) Framework Call-Off Contract FHFT
SEN20465-SEN-TAXI-THE NEWBRIDGE SCHOOL
Corporate Eyecare Services
© 2026 SIA «Vietne». Alle rechten voorbehouden.