To assess five number road bridges - Brough New (B6276) and A591 - variously masonry with reinforced concrete extensions, reinforced concrete and corrugated steel buried. All in accordance with DMRB standards and as detailed in the scope.
Date limite
02.03.2026
Publié
18.09.2026
Attribué
18.09.2026
CWF Lot 1B - Heart of Kendal - Indoor Market Detailed Design and Construction
Design and Install a Skate Park at Queens Park, Windermere via ESPO Framework 115_25 Lot 4
CWF Lot 2A - Reconstruction of Old Row, Stainton Retaining Wall
A66 Northern Trans Pennine Project Professional Consultancy Services
CWF Lot 2B South Walney Landfill Erosion Resistance Works
CWF Lot 2A - Cockley Beck Cattle Grid Replacement
Structural engineer for Four Courts
HPFT - Oak & Beech VRF Replacement MES Design Stage
Fire Risk Assessment Consutlant
RAAC Replacement - Structural Engineering SMH & CHX
Structural Engineering Consultancy & Associated Services for Civic Centre 1 Piazza Refurbishment
Structural Surveys
Workplace Services - Security Guarding
DPS1 1386 - Housing Tree Work
DPS1 1375 - Housing Tree Work
Future Employment Support - EOI
Vehicle Purchase
CPU 8628 Mix It Potholes - Elastomac Works - Provision for delivery of statutory Highway Maintenance
© 2026 SIA «Vietne». Tous droits réservés.