RAAC has been found at SMH and CXH Hospitals, which require Urgent technical support to ensure their management and eventual elimination.
Date limite
17.02.2026
Publié
22.06.2026
Attribué
22.06.2026
Structural engineer for Four Courts
HPFT - Oak & Beech VRF Replacement MES Design Stage
Fire Risk Assessment Consutlant
Structural Engineering Consultancy & Associated Services for Civic Centre 1 Piazza Refurbishment
Structural Surveys
Condition Surveys
© 2026 SIA «Vietne». Tous droits réservés.