The waterproofing package includes the supply of all materials, namely bonded and unbonded membranes, waterbar materials and accessories, which are assembled and installed to form a specific waterproofing system to meet the design requirements. Dependent on the waterproofing system used, the waterproofing materials can be cast into the concrete when poured or applied post pour. The system design is installed to prevent the ingress of water into. The requirement includes 120,000 m2 bonded membrane, 45,000 m2 unbonded membrane, 30,000 l/m joint waterbars, 4,500 l/m hydrophilic waterbars, 15,800 l/m elastomer waterbars, 36,540 l/m PVC waterbars as well as related accessories such as 22,000 units of sealants and adhesives and compressible materials to suit seismic design.
Julkaistu
14.04.2026
Aktīvs
14.04.2026
Määräaika
23.04.2026
Tunnel Segment Production Monitoring System copy
Suljettu·Aug 17
Tunnel Segment Production Monitoring System
Suljettu·Aug 12
Site Power HV/LV Electrical Design
Suljettu·Aug 10
Tunnel Segment Production Monitoring System
Suljettu·Aug 6
Fire and Rescue Services
Suljettu·Apr 29
Instrumentation and Monitoring
Suljettu·Apr 29
CA17911 - Roofing Works Leicester College
Suljettu·May 27
CA17911 - Roofing Works Leicester College
Suljettu·May 27
SZC - Waterproofing Materials
Suljettu·Apr 14
PAHT - Waterproofing Works in Plantrooms
Myönnetty·Mar 24
PAHT - Waterproofing Works in Plantrooms
Myönnetty·Mar 24
GB-Headington: MW2507 - Hastoe - Balcony Remediation Works
Myönnetty·Feb 26
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Myönnetty·Oct 31
March 2027 Bus Contracts
Myönnetty·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Myönnetty·Oct 30
Provision of Pre-Paid Cards
Myönnetty·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Myönnetty·Oct 30
Business Travel Services
Myönnetty·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.