The HV/ LV electrical design is essential to develop a robust and safe electrical distribution network within the Tunnel Launch Compound (TLC), the STP, SXB, SMT areas within the Temporary Construction Area (TCA) and the Ancillary Construction Area (ACA) to support tunnel construction at the SZC site. The network will be required to distribute power to the following areas and equipment: Underground: Tunnel boring machines (TBMs), Slurry pump system Underground Conveyor belt system Ventilation system Lighting & Communication networks Ancillary tunnel construction equipment Overground: Ventilation system Cooling water system Overground conveyor belt system Overground slurry pump system Compressed air system Grout batching plant Dewatering system & water treatment plant Gantry cranes Site lighting, access control & communication systems Office building/ welfare Ancillary site activities Electrical loading details of the equipment listed above will be collated and provided by CWA to the selected electrical design engineers. The design will be required to comply with current British Electrical safety legislation. Key Deliverables: HV network design - Provide the design for the distribution of the 11kV network that feeds the TLC, TCA & ACA compounds complete with associated switchgear, cable sizing, cable routes and containment systems. Provide protection settings of circuit protective devices for safe disconnection of the supply under fault conditions. Stage 4 drawings complete with associated schematics to be provided of proposed cable routes, ducting sizing/ routes, substation locations. The design will need to be agreed with the CWA/ Sizewell site team to ensure power demands and circuit configurations are compatible with the wider HV network on site. Substation design - The design and specification of the substations complete with earthing design to distribute and transform where necessary the main 11kV supply that will be used to supply the above listed compounds. Where LV (690v/400v) supplies are required, suitably sized transformers to be specified to provide sufficient power for the supplied equipment. Stage 4 drawings complete with associated schematics to be provided of substations. LV Network - Provide the design for the distribution of LV network to supply required equipment/ plant with associated switchgear, cable sizing, cable routes and containment systems to required areas of distribution. Provide protection settings of circuit protective devices for safe disconnection of the supply under fault conditions. Stage 4 drawings complete with associated schematics to be provided of proposed cable routes, substation/feeder pillar locations, MDU sub main distribution locations. Site Lighting - Provide site lighting design to provide adequate lighting for site activities. Stage 4 drawings complete with associated schematics to be provided of lighting locations and specifications.
Julkaistu
10.08.2026
Avoinna tarjouksille
10.08.2026
Määräaika
18.08.2026
Tunnel Segment Production Monitoring System copy
Suljettu·Aug 17
Tunnel Segment Production Monitoring System
Suljettu·Aug 12
Tunnel Segment Production Monitoring System
Suljettu·Aug 6
Fire and Rescue Services
Suljettu·Apr 29
Instrumentation and Monitoring
Suljettu·Apr 29
Instrumentation and Monitoring
Suljettu·Apr 29
Substation 9 LV Panel & Generator Replacement and Evelina Standby Power
Myönnetty·Aug 3
PCI_LotA_174 Energy Infrastructure and opportunities analysis
Myönnetty·Feb 16
Infrastructure Connection Design Support - Pathology Lab
Myönnetty·Oct 30
Provision of Pre-Paid Cards
Myönnetty·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Myönnetty·Oct 30
Business Travel Services
Myönnetty·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Myönnetty·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Myönnetty·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.