This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration. This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.
Julkaistu
17.08.2026
Avoinna tarjouksille
17.08.2026
Määräaika
21.08.2026
Tunnel Segment Production Monitoring System
Suljettu·Aug 12
Site Power HV/LV Electrical Design
Suljettu·Aug 10
Tunnel Segment Production Monitoring System
Suljettu·Aug 6
Fire and Rescue Services
Suljettu·Apr 29
Instrumentation and Monitoring
Suljettu·Apr 29
Instrumentation and Monitoring
Suljettu·Apr 29
Tunnel Segment Production Monitoring System
Suljettu·Aug 12
Tunnel Segment Production Monitoring System
Suljettu·Aug 6
Infrastructure Connection Design Support - Pathology Lab
Myönnetty·Oct 30
Provision of Pre-Paid Cards
Myönnetty·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Myönnetty·Oct 30
Business Travel Services
Myönnetty·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Myönnetty·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Myönnetty·Oct 30
Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.