597953 / The construction of 2 x (400 kV + 110 kV) transmission line Toivila - Hikiä, part 1

Myönnetty·30 syys 2026·EUR 43,400,000

597953 / The construction of 2 x (400 kV + 110 kV) transmission line Toivila - Hikiä, part 1 The client has decided to build a new 2 x (400 kV + 110 kV) power lines between Toivila and Hikiä substations. The new transmission line will be mostly located in the place of the existing 110 kV power lines. Both new transmission lines will be constructed with 400 kV + 110 kV structures. Only 400 kV conductors will be installed on the western transmission line (design code 2055). Both 400 kV and 110 kV conductors will be installed on the eastern transmission line (design codes 2084 and 2085). The length of part 1 ( Toivila - Anttula) is approx. 42km.,

Julkaistu

30.09.2026

Myönnetty

30.09.2026

Määräaika

30.03.2027

Otnox

Löydä hankinnat, joihin kannattaa osallistua.

Luo tili, jotta voit tutkia tätä hankintaa ja löytää vastaavia mahdollisuuksia.

  • Hankinta-asiakirjatTarkastele saatavilla olevia tiedostoja yhdessä työtilassa.
  • Vaatimukset ja riskitTilaa asiakirja-analyysi, jossa on viitteet lähteisiin.
  • HankintavalikoimasiJatka valitsemillasi markkinoilla ja toimialoilla.