Expression of Interest T5D MEP Subcontractor T5D Attenuator Overhaul (Survey / RIBA 4iii) Scope The T5D Rail-tunnel Ventilation Shaft is located adjacent to T5D at its North and can be accessed from the bottom (Level 6) via the trackside of the HEX tunnel or from the top (level 7) via Airside. The objective is to replace the four attenuators in the T5D Shaft because they are at their end of life. The renewal of the T5D attenuators aims to reduce the risk of debris entering fans, tunnels and station, prevent the fans from failing in any fire scenario and provide ventilation and smoke clearance for the Heathrow Rail Tunnels. This improves safety conditions in Heathrow Rail Tunnels and improves resilience of systems. In addition, less maintenance and repair are required for the attenuator. Each attenuator is formed of four quadrants weighing around 1160 kg. Review MEP systems along the airflow and advise replacement/modification to bring them up to compliance. Surveys will be carried out by MEP Subcontractor under the direction of the Design Consultant (Employed by the Client). Item Question Q1 What capability do you have of understanding the requirements for replacing attenuators etc., considering the constraints of an operational rail network? Q2 What capability do you have of carrying out a survey of the T5D Shaft during non-operational hours to provide all the information required to complete the RIBA 4ii design by the Design Consultant and the RIBA 4iii by the MEP Subcontractor? • M&E Services within the air path • Fan and Attenuator • Structure Note: - RIBA 5 onwards including construction is excluded.
Published
02.06.2026
Aktīvs
02.06.2026
Deadline
09.06.2026
HVAC design and Support services 2026
Project CALLISTO
CBIP-WS2-RISK REDUCTION-MDS-RIBA2-FWK1146-MDS4003
MDS FOR UNDERGROUND CAR PARK AND CRITICAL SERVICES WORKS
Members' Tea Room Refurbishment Project - MDS4001
WP1140 - T5D Design Consultant
CA18255 - RFQ2026/24 - NMANDD PEACEPLUS Thriving Together-Minority Community Support Programme: Sports for All for the Newry, Mourne and Down District Council area.
Creative Sector Services CIC (t/a Creative United) Take it away Scheme Credit Provider Contract
Childrens Playtower
2026-09-07 09:00 - QTN048 Exning to Stanton Community Primary School, Stanton - AWARD
Revenues and Benefits Printing and Mailing Service
ITT for project 10181682
© 2026 SIA «Vietne». All rights reserved.