The T5D Rail-tunnel Ventilation Shaft is located adjacent to T5D at its North and can be accessed from the bottom (Level 6) via the trackside of the HEX tunnel or from the top (level 7) via Airside. The objective is to replace the four attenuators in the T5D Shaft because they are at their end of life. The renewal of the T5D attenuators aims to reduce the risk of debris entering fans, tunnels and station, prevent the fans from failing in any fire scenario and provide ventilation and smoke clearance for the Heathrow Rail Tunnels. This improves safety conditions within Heathrow Rail Tunnels and improves resilience of systems. In addition, less maintenance and repair are required for the attenuator. Each attenuator is formed of four quadrants weighing around 1160 kg. Review MEP systems along the airflow and advise replacement/modification to bring them up to compliance. Surveys will be carried out by others (Employed by the Client) under the direction of the Design Consultant Item Question Q1 Do you have experience with Underground rail network ventilation resilience? Requirement: Ventilation Resilience Report required for the HAL Rail underground network. Q2 What capability do you have of air flow modeling for fans / attenuators etc.? Requirement: Model the existing configuration with one fan operating, and both fans operating and then repeat the modelling with shaft sub divided to allow one set of attenuators to be replaced while the other is operational. Q3 What capability do you have of understanding the requirements for specifying replacement attenuators etc., Specifically considering the constraints of an operational rail network? Note: - RIBA 5 onwards including construction is excluded.
Published
02.06.2026
Open for bids
02.06.2026
Deadline
09.06.2026
WP6235 -T5D MEP Subcontractor
Closed·Jun 2
WP1140 - T5D Design Consultant
Closed·Jun 2
WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Closed·Jun 2
WP1150 - Survey & Design - Tunnel Vent Vans & Fan Drives
Closed·Jun 2
WP6235 -T5D MEP Subcontractor
Closed·Jun 2
WP2140 - TR19 MEP Surveys
Closed·May 7
Arts and Sports Bridge - Pre-Construction Professional Services
Awarded·Sep 23
HVAC design and Support services 2026
Awarded·Jul 31
Project Callisto
Closed·Jul 6
Members' Tea Room Refurbishment Project - MDS4001
Awarded·Jun 25
Cbip-Ws2-Risk Reduction-Mds-Riba2-Fwk1146-Mds4003
Awarded·Jun 25
Mds for Underground Car Park and Critical Services Works
Awarded·Jun 25
The Responsible Medical Officer (RMO) Braintree
Awarded·Oct 26
The Purchase of 8 seater Vehicles
Awarded·Oct 26
CPU 8676 Planting of meadow turf in three areas and 2 years of Establishment at St Peter's Street
Awarded·Oct 26
26064 Cambridgeshire Carriageway Resurfacing 26/27 - Package 1 (Further Competition EHF 4, Lot 1)
Awarded·Oct 26
37418 - West Gate School
Awarded·Oct 26
Digital and Technology Solutions Apprenticeship Level 6
Awarded·Oct 26
Create an account to explore this tender and find similar opportunities.