a. The Contract Works required are: i. Block H (a) Replacement of the glass bi-fold doors with a more functional door that is easier to open and close on a daily basis. (b) Development of an outdoor learning area adjacent to the classrooms with better connection from inside to outside ii. Block I. (a) Replacement of the electrical window openers with manual openers. iii. Site: (a) Install cages to heat pump condenser units wherever these are accessible to pupils. (b) Install new stormwater drainage from Blocks H and C. (c) Install RCBOs to 6 no. DBs and carry out minor electrical repairs. iv. The scale of the works is medium v. Pricing should split into six separable portions as per items i (a) – iii (c) above with P&G and margin pro rataed. The school cannot make all areas available at one time. vi. Phasing and/or staged handover of the project will be negotiated with the school. vii. The site is flat and level with easy vehicle access. viii. The Contractor will be engaged through a Medium Works Contract. No Contract related tags will be considered. The Principal prefers there to be no drawings and specification related Tags. ix. See Tender Documents for further information.
Published
27.07.2026
Open for bids
27.07.2026
Deadline
20.08.2026
New Canopy at James Cook School
Active
ROI for Main Contractor for Design & Build Walkway Canopy Replacement and Minor Roof Remedials at Whangarei Intermediate School
Active
Main Contractor for Fencing and Carpark works at Waterloo School (Wellingon)
Active
Main Contractor for Blocks E&I re-roof project at Taupo-nui-a Tia College
Active
Main Contractor for Block O, P, X, Y: OLE, Decking Replacement and WT Remediation at Peachgrove Intermediate School
Active
Main Contractor for Block G Student WC Upgrade and Acoustic Wall Covering Replacement
Active
© 2026 SIA «Vietne». All rights reserved.