The James Cook School Board of Trustees wish to procure the services of a suitably qualified contractor to design, supply and install a new permanent outdoor shade structure complete with stormwater services connected to the existing infrastructure. The shade structure is to be approx. 27m x 14.6m.
Published
19.08.2026
Open for bids
19.08.2026
Deadline
18.09.2026
ROI for Main Contractor for Design & Build Walkway Canopy Replacement and Minor Roof Remedials at Whangarei Intermediate School
Active
Main Contractor for Fencing and Carpark works at Waterloo School (Wellingon)
Active
Main Contractor for Blocks E&I re-roof project at Taupo-nui-a Tia College
Active
Main Contractor for Block O, P, X, Y: OLE, Decking Replacement and WT Remediation at Peachgrove Intermediate School
Active
Main Contractor for Block G Student WC Upgrade and Acoustic Wall Covering Replacement
Active
Central Normal School - Roofing Replacement
Active
© 2026 SIA «Vietne». All rights reserved.