The Government of the Cooperative Republic of Guyana (GCRG) has received financing from the World Bank toward the cost of the Integrated Transport Corridors Project (ITCP) and intends to apply part of the proceeds for consulting services. The consulting services (“the Services”) include: (1) Conducting a detailed review of the existing Designs for CW 1. (2) Conducting a detailed review of the Bid Documents submitted for the Design-Build Contract for CW 2, (3) Providing Procurement Support to the Client during the bidding process for CW1 and CW2, (4) Supervision of CW1 and CW 2 Contracts during the Construction and Defects Liability Periods. CW 1 will involve the improvement of approximately 27 kilometers of roadway and associated roadway structures, and CW 2 will involve the extension/construction of the three (3) main bridges, namely the Mahaica River, Mahaicony River and Abary River Bridges. The civil works are located within the section of road corridor in Regions 4 and 5, specifically the section between the Mahaica River Bridge and the Abary River Bridge. The expected timeframe for delivery of this assignment is 42 calendar months and is projected to utilize an estimated 446 person-months. The expected/projected start date is October 01, 2026. The detailed Terms of Reference (TOR) for the assignment can be obtained at Address 1 given below during office hours from 9:30 hrs. to 15:30 hrs. Guyana Time or via email.
Published
03.07.2026
Open for bids
03.07.2026
Deadline
05.08.2026
Selection Improvement (Rehabilitation and Upgrade) of the Selected Regional Road Corridor -Reconstruction of Existing Road Network on the East Coast Demerara – Lot 2: Design and Build Bridges: Across the Mahaica, Mahaicony and Abary Rivers/Creeks.
Active
Improvement (Rehabilitation and Upgrade) of the Selected Regional Road Corridor - Reconstruction of Existing Road Network on the East Coast Demerara – Lot 2: Design and Build Bridges: Across the Mahaica, Mahaicony and Abary Rivers/Creeks
Active
Old Demerara Harbour Bridge Relocation Project: Sandhills-Timehri Crossing
Active
REHABILITATION/CONSTRUCTION OF HINTERLAND ROADS - PHASE 1 LOTS 1 - 35
Active
© 2026 SIA «Vietne». All rights reserved.