The Government of the Cooperative Republic of Guyana (GCRG) has received financing from The World Bank toward the cost of the Integrated Transport Corridors Project (ITCP) and intends to apply part of the proceeds toward payments under the contract for the Improvement (Rehabilitation and Upgrade) of the Selected Regional Road Corridor -Reconstruction of Existing Road Network on the East Coast Demerara – Lot 2: Design and Build Bridges: Across the Mahaica, Mahaicony and Abary Rivers/Creeks. The Ministry of Public Works intends to initially select Applicants for the Improvement (Rehabilitation and Upgrade) of the Selected Regional Road Corridor -Reconstruction of Existing Road Network on the East Coast Demerara – Lot 2: Design and Build Bridges: Across the Mahaica, Mahaicony and Abary Rivers/Creeks. The Works to be provided, including, but are not limited to, supplying all design plans/drawings, documentation, equipment, materials, labour, and incidentals necessary to successfully complete the project in compliance with the contract provisions. Detailed Employer's Requirements are provided in a separate document, which includes comprehensive technical specifications for: Bridge design, structural, geotechnical, and foundation requirements Hydrological and hydraulic design Survey requirements Environmental and Social (ES) management Health and Safety obligations HIV/AIDS alleviation campaign Quality Assurance/Quality Control (QA/QC) Product warranties Permanent signing, pavement markings, and safety facilities Landscaping and grassing Utility relocation requirements Contractor's facilities and site office requirements
Published
10.07.2026
Open for bids
10.07.2026
Deadline
19.08.2026
Selection Improvement (Rehabilitation and Upgrade) of the Selected Regional Road Corridor -Reconstruction of Existing Road Network on the East Coast Demerara – Lot 2: Design and Build Bridges: Across the Mahaica, Mahaicony and Abary Rivers/Creeks.
Active
Old Demerara Harbour Bridge Relocation Project: Sandhills-Timehri Crossing
Active
REHABILITATION/CONSTRUCTION OF HINTERLAND ROADS - PHASE 1 LOTS 1 - 35
Active
Review of Designs, Procurement Support and Construction Supervision Consultancy [inclusive of Environmental and Social (E&S) Compliance] for the Selected Regional Road Corridor - Reconstruction of Existing Road Network on the East Coast Demerara: Mahaica Bridge to Abary Bridge Road Corridor (CW1 and CW 2)
Active
© 2026 SIA «Vietne». All rights reserved.