Published
23.12.2025
Open
23.12.2025
Deadline
12.01.2026
Prequalification for delivery of pre-insulated materials for the distribution of district heating and cooling in Finland
Active
Prequalification for Electrical Works to Suomenoja Power Plant
Active
Prequalification for High temperature heat pump for steam production
Active
Prequalification for Electrical steam generator to Suomenoja
Active
© 2026 SIA «Vietne». All rights reserved.