The Trust has a new requirement to deliver a sustainability programme that combines two separate but intrinsically linked projects to achieve NHS Net Zero targets, improve resilience, and future-proof infrastructure. These projects are titled "Public Sector Decarbonisation" and "High Voltage Infrastructure". The purpose of this procurement is to procure a supplier to provide an M&E Engineer led multi-disciplinary design team to complete the design phase (RIBA stage 2) and provide technical advisory services to the main contractor through RIBA stages 3 to 7 for both projects.
Deadline
05.03.2026
Published
04.08.2026
Awarded
04.08.2026
Gassiot House Fire Door Replacement
Active
Next Step service - Home from Hospital Service
Active
Ward Refurbishment Programme: Project Manager Albert, Somerset and Samaritan Wards
Active
Clinical Engineering Test Equipment
Active
Training courses for Doctors.
Active
Feasibility Study and Report of Heating Systems
Active
© 2026 SIA «Vietne». All rights reserved.