The Trust has a requirement to refurbish and replace fire doors throughout Gassiot House This was awarded through the NHSSBS SBS framework- Building Safety and Fire Compliance (SBS10509), Lot 1.1 - Passive fire safety
Deadline
21.12.2025
Published
11.08.2026
Awarded
11.08.2026
Next Step service - Home from Hospital Service
Active
Ward Refurbishment Programme: Project Manager Albert, Somerset and Samaritan Wards
Active
Clinical Engineering Test Equipment
Active
Training courses for Doctors.
Active
Feasibility Study and Report of Heating Systems
Active
M&E Engineer Led Design Team for PSDS and HV/LV
Active
© 2026 SIA «Vietne». All rights reserved.