To undertake Engineering Safety Studies (ESS) in response to multiple safety concerns of the public or partners, as brought to the attention of the local Cumbria Road Safety Partnership (CRSP) Group or triggered by collision criteria being reached. Studies which look to find similarities between collisions that have occurred at a single site or across a route which would indicate that there may be a determinable problem with an aspect of the infrastructure, such as road markings or traffic signs. The study will identify and present initial options for remedial measures indicating First Year rate of Return and recommended scheme(s) within a Report.
Deadline
31.10.2025
Published
10.06.2026
Open for bids
10.06.2026
CWF Lot 2B - Broadhead Bridge (Replacement Structure)
Active
Barrow Multi-Modal Transport Study
Active
Lot 1b - Up to 8 Passenger Seats with Passenger Assistant for various areas closing 23 February 2026 (F43)
Active
Lot 1a - Up to 8 passenger seats for various areas closing 23 February 2026 (F43)
Active
Lot 1b - Up to 8 Passenger Seats for Out of County area closing 2 February 2026 (F40)
Active
Kirkby Lonsdale Library - Plaster Works
Active
© 2026 SIA «Vietne». All rights reserved.