Barrow Multi-Modal Transport Study Study will assess the impact of jobs and economic growth in Barrow through the use of scenarios and identify potential intervention measures required to support this growth.
Deadline
07.04.2026
Published
07.07.2026
Awarded
07.07.2026
CWF Lot 2A - Garrigill Retaining Wall Rebuild
Awarded·Nov 2
PSF4 Lot 2B - Structural Assessments - A590 Jubilee Bridge Walney
Awarded·Nov 2
CWF Lot 2B - Riverside Corridor, Kendal, Active Travel
Awarded·Sep 18
CWF Lot 2B - Broadhead Bridge (Replacement Structure)
Awarded·Jul 7
Lot 1b - Up to 8 Passenger Seats with Passenger Assistant for various areas closing 23 February 2026 (F43)
Awarded·Jun 16
Lot 1a - Up to 8 passenger seats for various areas closing 23 February 2026 (F43)
Awarded·Jun 16
Crossens Pumping Station Pre SOC
Awarded·Nov 2
SW - WSX - Direct Award AOMR Lot 1 - North Drain LOW ROOFS
Awarded·Oct 30
SW - WSX - Direct Award AOMR Lot 1 - Phase 2 Pumping Station Roofs
Awarded·Oct 30
SW - WSX - Direct Award AOMR Lot 1 - Beaminster and Swanage Reservoir Repairs
Awarded·Oct 29
ITEP1261 - I&P Cloud DevSecOps Engineering & FINOPS team
Awarded·Oct 28
Framework for Call-down Technical Assistance - Engineering and Climate-Resilient Infrastructure Advisory Services (BRAVE-IS)
Open for bids·Oct 23
Housing & Property Management Level 4 apprenticeships
Awarded·Nov 3
Fire Remediation works - Baker House (D&B)
Awarded·Nov 3
Humber Economic Strategy Delivery Plan
Awarded·Nov 3
ENHT - Legal Support HCH PFI 2026
Awarded·Nov 3
Super Pumping Appliances
Awarded·Nov 3
APEX and PowerApp Support
Awarded·Nov 3
Create an account to explore this tender and find similar opportunities.